Ardenwood / Lobdell Connector Project Page

Project Description: This connector road will be a new alignment within the proposed Ardendale development and may connect to the HUD development on the west side of Ardenwood as provided by the scope of work in the proposition. The proposed section is a two-lane subdivision type street with pedestrian, bicyclist, transit accommodations within the right of way.

Council District: 6

Project Type: New Capacity

Current Phase: Design

Design Consultant: Bonton Associates

Project Manager: Brian Smith

Proposition Budget: $3,000,000

Estimated Letting Date: 2024

Project Updates

Date Status
10/2020 The Design Consultant is preparing the design study. A public meeting will be held at the conclusion of the design study phase.

 

Documents

Comments