Bluebonnet Blvd Sidewalks (N Mall Rd to Bluebonnet Centre Blvd) Project Page

Project Description: This project proposed to provide sidewalk connectivity along Bluebonnet Blvd. from N. Mall Dr. to Bluebonnet Centre Pkwy. This project will also continue sidewalk connectivity from the Dijon Dr. Phase II MOVEBR project.

Council District: 11

Project Type: Community Enhancement

Current Phase: Design

Design Consultant: Civil Solutions CG/Gresham Smith

Project Manager: Henok Abebe

Proposition Budget: $1,000,000

Estimated Letting Date: 2025

Project Updates

Date Status
11/2023 Final plans are being developed by the consultant.
12/2022 The Design Consultant has submitted the 90% final plans and they are under review. The Traffic Design Consultant has submitted Preliminary Pedestrian Signal and Lighting Plans and they are under review.
05/2022 The Design Consultant is preparing 90% final plans.
12/2021 The Design Consultant has submitted the preliminary plans and has performed additional topographic survey field work.
09/2021 The Design Consultant is preparing the preliminary plans and performing additional topographic survey field work.
05/2021 The Design Consultant is preparing the design study and performing topographic survey field work.
01/2021 Negotiations with the selected Engineering Design Consultant have been finalized and contract is being processed. Upon execution of contract, a notice to proceed will be issued.
10/2020 Negotiations and contracting are underway with the Engineering Design Consultant.

Documents

Comments

To contact the MOVEBR program team about this project, please complete the form below and a member of our team will get in touch with you shortly.