Nicholson Segment 2 (Bluebonnet - Ben Hur) Project Page

Project Description: Nicholson Segment 2 is a proposed widening from Ben Hur to Bluebonnet. The road from Ben Hur to Gardere will be transferred to the City as a parish route and the remainder from Gardere to Bluebonnet will remain a state route. A complete street typical section will be considered in the design study for final plans.

Council District: 3

Project Type: New Capacity

Current Phase: Planning

Design Consultant: Volkert, Inc.

Project Manager: Brian Smith

Proposition Budget: $42,000,000

Estimated Letting Date: 2027

Project Updates

Date Status
09/2023 The LA DOTD will be considering this phase of Nicholson as part of the LA 30 NEPA process. This project will move forward after approval of that document.
03/2023 The DOTD will be considering this phase of Nicholson as part of the LA 30 NEPA process. This project will move forward after approval of that document.
11/2021 The Design Consultant is performing the geotechnical investigation, and preparing the Traffic Study portion of the Design Study.
07/2021 The Design Consultant is performing the geotechnical investigation and subsurface utility exploration, and the corridor survey.
04/2021 The Design Consultant is performing the geotechnical investigation and the corridor survey. 
12/2020 Contracting is underway for the design study to be completed by the Engineering Design Consultant.

 