Project |
Most Recent Update (as of October 2025) |
Mt Pleasant Rd Sidewalks & Mid-block Crossing @ Zachary Youth Baseball Park (Funds Transfer) |
Consultant working on finalizing 100% Plans. |
Perkins Rd Overpass |
Design Consultant is now working on the 100% Final Plan submittal and coordinating with KCS RR. Entergy utility relocations are now complete. KCS RR is anticipated to begin construction of pedestrian crossing pad prior to the end of 2025. |
Parishwide Traffic Calming Improvements/Speed Signs |
Original construction complete. Six additional locations were added and currently being installed. |
Progress Rd (Blount Rd to Scotland Ave) |
Design Study submitted by Consultant and reviewed by PMT. Railroad coordination has begun near LA 19 intersection. |
Bluebonnet Blvd. Mid-Block Crossing |
Poles, signal cabinets, and majority of work installed, but not powered on. Sidewalk construction ongoing. |
Blue Grass Dr Improvements and Sidewalk |
The 100% design submittal is being reviewed by the PMT and bid documents are being prepared. |
Goodwood Blvd Sidewalks and Bike Path |
The Design Consultant is now preparing 90% Final Plans. |
Madison Ave Sidewalks |
The Design Consultant is currently revising 100% final plans to incorporate changes to address drainage field conditions. |
Lobdell Ave/Goodwood Blvd Pedestrian Crossing |
Consultant has submitted 90% Plans and is currently under review. |
Lobdell Ave/Sevenoaks Ave Pedestrian Crossing |
Consultant has submitted 90% Plans and is currently under review. |
Glasgow near Glasgow Middle |
Design consultant working on 90% Final Plans. |
Scotlandville Towncenter Plaza |
The Design Consultant submitted 60% Design Plans, which are currently under review by the PMT. |
Greenwell St Sidewalks |
Contract procurement is underway for the Engineering Design Consultant. |
Cora Dr Sidewalks / Broadmoor Sidewalk and Bike Path (Cora Dr) |
The Design Consultant is working on 90% Final Plans. |
Hundred Oaks Ave Sidewalks |
Construction is Complete. |
George Oneal Rd Sidewalks |
Construction contract has been executed. Construction is anticipated to begin in October 2025. |
Lobdell Ave/Government St Roundabout Lighting |
Project is currently waiting on Entergy to complete construction of the lighting. |
Rosenwald Road from Scenic Hwy to Scotland Ave |
Design consultant working on 90% Final Plans. |
Robertson Ave Sidewalks |
60% Final Plans under PMT review. |
Marilyn Drive Sidewalks / Broadmoor Sidewalk and Bike Path (Marilyn Dr) |
The Design Consultant is preparing the Design Study submittal. |
S Harrell's Ferry Rd Bike Lanes |
Currently coordinating an NTP date with the Contractor. |
South Boulevard Trailhead Connection |
Consultant working towards 100% Final Plans. Railroad coordination is underway. |
Audubon Ave Sidewalk |
Negotiations and contracting are underway with the Engineering Design Consultant. |
Pollard Pkwy. Sidewalk (Combined with Lancaster) |
Construction is underway. |
Sunshine Rd (Lavey Ln to Thomas Rd) |
Consultant is working towards 90% Final Plans. |
Lancaster Ave. & Pollard Pkwy Sidewalks |
Construction is underway. |
N Ardenwood Dr Sidewalks |
Negotiations and contracting are underway with the Engineering Design Consultant. |
Floynell Dr Sidewalk |
Consultant is working towards 60% Preliminary Plans. |