Project Description: Design and coordination for this project shall include but is not limited to the following:

  • Design new sidewalks that meet ADA requirements on both sides of Glasgow Avenue from Hyacinth Avenue to Perkins Road.
  • Design drainage improvements to accommodate the sidewalk construction along corridor.
  • Existing sidewalks that are in good condition and meet ADA requirements should be maintained and incorporated into the project.

Council District: 12

Project Type: Call For Projects

Current Phase: Design

Design Consultant: Meyer Engineers

Project Manager: Henok Abebe

Current Cost Estimate ($M): $1.00

Estimated Letting Date: January 2026

Project Updates

Date Status
11/2025 Design consultant working on 90% Final Plans, expected end of November 2025.
08/2023 This project is in the planning phase based on prioritization. No design activity is underway.