Madison Ave Sidewalks Project Page

Project Description: Provide new sidewalks on both sides of Madison Ave. from N. 15th St. to N. 18th St. Also, no littering signage.

Council District: 10

Project Type: Call For Projects

Current Phase: Design

Design Consultant: Southern Shores Eng.

Project Manager: Josh Olivier

Current Cost Estimate ($M): $0.60

Estimated Letting Date: January 2026

Project Updates

Date Status
11/2025 The Design Consultant is currently revising 100% final plans to incorporate changes to address drainage field conditions. Expecting submittal early November 2025.
12/2024 The Design Consultant is currently preparing 100% final plans.
08/2023 Negotiations and contracting are underway with the Engineering Design Consultant.