Marilyn Drive Sidewalks / Broadmoor Sidewalk and Bike Path (Marilyn Dr) Project Page

Project Description: Provide new sidewalks & lighting on both sides of Marilyn Dr. from Goodwood Blvd. to Florida Blvd.

Council District: 6

Project Type: Call For Projects

Current Phase: Design

Design Consultant: Pivotal Engineering, LLC

Project Manager: Billy Wall

Current Cost Estimate ($M): $1.80

Estimated Letting Date: Q3 2026

Project Updates

Date Status
11/2025 The Design Consultant is preparing the 60% (plan in hand) design submittal.
10/2025 The Design Consultant is preparing the Design Study submittal.
08/2023 This project is in the planning phase based on prioritization. No design activity is underway.